Now hiring

Constraint & Delivery Manager (Thermal) @ Vertiv

Pune, Maharashtra, INOnsiteFull-timeJob reference 20280832
Apply with ResuMinder

Opens on the employer's site

About this role

Hi,

Please find JD.

Constraint & Delivery Manager Time Horizon

0 – 30 days

PURPOSE Own plant-level supply constraint identification and delivery performance. First-line resolver of supply disruptions — acting before the production scheduler knows there is a problem. No line stops, no surprises, no excuses.

REPORTS TO Regional Procurement Lead — solid line

KEY RESPONSIBILITIES

Key Responsibilities

• Identify and escalate supply constraints daily; own plant-level constraint register

• Manage supplier delivery performance at plant level; drive root cause analysis on failures

• Mitigate line-down risk: coordinate emergency supply actions before impact on production

• Expedite critical materials; escalate commercial leverage requirements to RCM after exhausting first-line options

• Coordinate cross-functionally with production planning; maintain aligned constraint and delivery horizon

• Execute root cause analysis on delivery failures; track corrective actions through to closure

• Support inventory optimisation: flag excess and shortfall positions to planning team

• Participate in Category Team as extended member; surface recurring supplier delivery issues to GCM/RCM

Escalation Path: Product & project issues → Procurement Product Line Management structure | Category & supplier issues → Category Management structure

KEY PERFORMANCE INDICATORS

KPI 2026 Benchmark / Target

Line-Down Incidents Zero procurement-attributable line stops (Deloitte 2025: best-in-class = zero tolerance policy)

Supplier On Time Delivery Requested Delivery Failure Rate <5%; Promised Delivery Failure Rate <2%

Constraint Resolution Cycle Time ≤72 hrs from identification to resolution plan for Critical-category constraints

Expediting Cost <0.5% of managed spend attributed to emergency/expedited freight and premiums

Past-Due PO Reduction Rate 10% QoQ reduction in past-due purchase order backlog at plant level

Production Schedule Adherence ≥98% of production schedules met — procurement-attributable shortfalls <2%

GOVERNANCE CADENCE

Forum Frequency Focus

Plant Supply Chain & Delivery Review Daily / Weekly Constraint identification; line-down risk; expedite actions; Tier 1–4 plant cadence

Category Team (Extended) Per Global Category Council Recurring supplier delivery issues surfaced to GCM/RCM for commercial action

Production Planning Alignment Daily Constraint horizon update; inventory position; schedule risk flags

RCM Escalation As required Commercial escalation for expediting after first-line options exhausted

Ready to apply?

Install the ResuMinder extension and we'll auto-fill the application in seconds — no rewriting.

See how your CV scores