Now hiring

Line Operator @ PLZ

Mississauga, Ontario, CAOnsiteFull-time
Apply with ResuMinder

Opens on the employer's site

About this role

  • Check components at start of shift (valves/cans)—verify Item code with Shop Packet
  • Every hour and at start of shift check the following:
  • 1) weights of concentrate and propellant
  • 2) pressure
  • 3) vacuum
  • 4) crimp depth & diameter, stem height
  • 5) water bath temperature and water level
  • 6) Test the checkweigher machine using an challenge can checkweigher machine using an challenge can
  • Make sure there is water in the water bath maintained at or above 130oF
  • Check for dents and dirt
  • When using Nitrogen, make sure it is going in the can
  • Check batch # with compounding to make sure you have right concentrate, also verify with green release sticker from the lab.
  • At the end of a run, do a good wash-up:
  • 1) clean up filling heads, conveyors, hopper
  • 2) gas room

3) Fill out Filling Room Cleaning Log

  • At the end of a run, remove all cans/valves from the last run
  • Fill out Line Set-up Form in the following areas:
  • 1) Inspect Cans/Labels for damage
  • 2) Check codes against batch sheet
  • 3) Concentrate Release Number
  • 4) Sanitation of Surge Tank and Filling Heads Completed
  • 5) Scale Set-up (for tare weight)
  • 6) Line Set-up Purge
  • 7) Water temp between 55°C - 65°C(130°F-154°F).
  • No green stickers are to be left on pails.
  • Perform other duties as assigned.

Ready to apply?

Install the ResuMinder extension and we'll auto-fill the application in seconds — no rewriting.

See how your CV scores