- Check components at start of shift (valves/cans)—verify Item code with Shop Packet
- Every hour and at start of shift check the following:
- 1) weights of concentrate and propellant
- 2) pressure
- 3) vacuum
- 4) crimp depth & diameter, stem height
- 5) water bath temperature and water level
- 6) Test the checkweigher machine using an challenge can checkweigher machine using an challenge can
- Make sure there is water in the water bath maintained at or above 130oF
- Check for dents and dirt
- When using Nitrogen, make sure it is going in the can
- Check batch # with compounding to make sure you have right concentrate, also verify with green release sticker from the lab.
- At the end of a run, do a good wash-up:
- 1) clean up filling heads, conveyors, hopper
- 2) gas room
3) Fill out Filling Room Cleaning Log
- At the end of a run, remove all cans/valves from the last run
- Fill out Line Set-up Form in the following areas:
- 1) Inspect Cans/Labels for damage
- 2) Check codes against batch sheet
- 3) Concentrate Release Number
- 4) Sanitation of Surge Tank and Filling Heads Completed
- 5) Scale Set-up (for tare weight)
- 6) Line Set-up Purge
- 7) Water temp between 55°C - 65°C(130°F-154°F).
- No green stickers are to be left on pails.