About this role
These positions are part of the WAPA-UGPR-Upper Great Plains Region within the Transmission System Planning, Engineering, Maintenance and Construction divisions. Please refer to the Additional Information section below for more information. Applicants completing degree requirements within 120 days of 10/09/2026 may apply. Unofficial transcripts must be uploaded at time of application and official transcripts are required prior to entrance on duty.