Now hiring

BRASKEM LM 24-05-3349 @ Apacheip

TexasOnsiteFull-time
Apply with ResuMinder

Opens on the employer's site

About this role

Job Description Position Title: Scaffold Builder Lead

Position Reports To: Foreman

Position Summary

A Scaffold Builder Lead directs a crew in the Foreman’s absence and responsible for directing personnel in the safe execution of the site-specific scope of work items outlined in the contract documents. According to sketches or blueprints, or while adhering to client, OSHA and company standards.

Essential Functions

• Follow verbal directions as required to perform duties and responsibilities as listed below.

• Heavy lifting will often be required to perform tasks.

• Must be able to kneel, squat, and climb.

• Must be able to perform required duties for extended periods of time.

• Clean up of work area, supplies, materials, and equipment.

• Communicate regularly with the Field Foreman with regard to issues and concerns on the job site.

• Responsible for ensuring that work continues in the Foreman’s absence.

• Comply with all Apache and client safety policies and programs.

• Maintain a reliable attendance records

• Always maintains a clean and safe work environment

• Work unsupervised in an efficient and effective manner.

• Able to wear all required PPE

• Other duties as assigned

Education & Experience

• Minimum 3-4 years of scaffold experience

• Minimum 1 year experience with Apache.

• Supervisory Experience (Preferred)

Knowledge, Skills, and Abilities

• Able to give clear and concise instructions to multiple employees in the execution of work.

• Possess the ability to maintain basic field equipment such as air compressors, man lifts, forklifts and etcetera.

• Ability to interpret erection drawings.

• Ensure that EVERY individual scaffold component is thoroughly inspected to verify good condition and integrity. Any defect encountered will require removal of services.

• Ensure that all scaffolds are erected/dismantled in accordance with industry standards and manufacturer, OSHA, Apache and client’s recommendations/requirements.

• Ensure that completed scaffolds are thoroughly inspected prior to tagging.

• Update scaffold-tags at the beginning of each shift, or more frequently if required.

• Transport materials to the site and erect the scaffold to the dimensions required

• Utilize fall protection to secure yourself, tools and materials

• Hammer material to each locking section

• Erect scaffolding, install ladders, handrails, platforms, catwalks needed in order to access work area

• Must maintain a positive attitude with crew members.

• Ensuring good housekeeping is being performed throughout the entire project - inside & outside.

Work Conditions/Physical Demands

• Remaining in a stationary position, often standing, or sitting for prolonged periods.

• Light work that includes moving objects up to 20 pounds.

• No adverse environmental conditions expected.

• Must be able to work in high noise volumes, toxic or caustic chemicals, fumes, airborne particles, dusty conditions, hazardous machinery, precarious places, proximity to other employees.

• Background Check Requirements

Drug Program

All employees at made aware that Apache has a comprehensive drug/ alcohol policy and program in place, which includes random testing

Ready to apply?

Install the ResuMinder extension and we'll auto-fill the application in seconds — no rewriting.

See how your CV scores