About this role
a { text-decoration: none; color: #464feb; } tr th, tr td { border: 1px solid #e6e6e6; } tr th { background-color: #f5f5f5; }
Key Responsibilities Project Execution • Execute electrical systems installation and commissioning activities for thermal power projects. • Monitor project progress and ensure adherence to project schedules, quality standards, and safety requirements. • Coordinate with EPC contractors, consultants, vendors, and internal stakeholders for seamless project execution. • Review project drawings, technical specifications, BOQs, and engineering documents. Electrical Engineering • Manage design reviews and installation of: • Generator & Generator Transformer (GT) • Unit Auxiliary Transformers (UAT) • Station Auxiliary Transformers (SAT) • Switchyard equipment (220kV/400kV/765kV) • GIS/AIS substations • HT/LT switchgear • Bus Ducts • Power & Control Cables • UPS, Battery Chargers & DC Systems • Illumination Systems • Earthing & Lightning Protection Systems
• Ensure statutory and regulatory compliance with relevant standards and codes. • Supervise erection, testing, and commissioning of electrical systems.
• Coordinate with equipment suppliers for troubleshooting and defect rectification.
• Conduct risk assessments and ensure adherence to HSE standards.
Dip / BE, B.Tech in Electrical.
Exp - 7-10 Years