About this role
<p><strong>Company:</strong> Barton Malow </p> <p><strong>Job Location: </strong>Sterling, Virginia </p> <p><strong>Position: </strong>Construction Scheduler (Mission Critical)</p> <p><strong>REQ ID: </strong>11940</p> <p> </p> <p><strong>POSITION SUMMARY</strong></p> <p>Scheduler is typically assigned to large complex and fast paced construction projects which require <span style="text-decoration:underline"><strong>hybrid</strong></span> work on the job-site. Willingness and enthusiasm to work on-site directly with the project team is critical. Must be a flexible and adaptable team player, as well as have strong communication and client service skills. Must develop relationships with operational personnel to drive process and deliver results.</p> <p> </p> <p><strong>KEY JOB RESPONSIBILITIES*: </strong></p> <p><a name="_Hlk100240326"></a>Leads planning & scheduling efforts and assists project teams in the preparation of project schedules and has ability to progress schedule status that facilitates subcontractor and owner reporting</p> <p><a name="_Hlk100240336"></a>Has ability to establish baselines, draft narratives and perform variance, float and delay analysis</p> <p><a name="_Hlk100240348"></a>Ability to forecast a project from a schedule perspective and align with cost and manhour projections</p> <p><a name="_Hlk100240378"></a>Drive change management process to properly document scope and/or unforeseen changes related schedule on each individual project, assisting with the incorporation of fragnets and TIA preparation</p> <ul> <li>Clearly communicate when risk factors arise on a project to on-site personnel and/or upper management to ensure proactive action is taken.</li> <li>May supervise and mentor Planning & Scheduling team members</li> </ul> <p> </p> <p><strong>REQUIRED KNOWLEDGE, EDUCATION, EXPERIENCE, SKILLS, AND ABILITIES: </strong></p> <ul style="list-style-type:disc"> <li>6 Years of Planning & Scheduling experience related to engineering or construction</li> <li><span>Mission Critical//Data Center Project experience preferred and desired, but not required.</span></li> <li>Proficient with Oracle P6 Professional</li> <li>Intermediate skills in MS Office skills, Word, Excel, Outlook, and Internet Explorer*</li> <li>Basic skills in Bluebeam, Autodesk Build and Box</li> <li>Ability to effectively manage and communicate workload with all members of the team. *</li> <li>Effective time management and organizational skills while paying attention to detail*</li> <li>Ability to identify, track, and complete work tasks in a timely manner</li> </ul>