About this role
<p>Manage Engineering team to make sure all machinery, facility, WWTP are under good conditions to support smooth production. Lead and drive projects to ensure normal production and support factory expansion/ business development when necessary; assist and support the site manager in the operation management and strategic planning of the factory.<br>Production equipment and facility<br>• Manage all equipment and facility as well as all maintenance activities to meet the requirements of Coats’s EHS and state’s regulations, with zero accident target<br>• Resolve all kinds of problems of equipment and infrastructures across the factory, with overall machine down time rate below the target.<br>Project management<br>• Lead and supervise the completion of projects, including capacity expansion and facility renovation.<br>• Responsible for machine upgrading, new machine installation & buyoff, infrastructures modification and expansion and so on <br>Cost management<br>• Taking responsibility of management of spare parts inventory and control the inventory cost.<br>• Lead projects with savings as plan<br>• Control the overall costs of machines’ maintenance/repairing as well as infrastructure’s maintenance to meet the targets.<br>• Manage the labour hours cost of the department to meet target.<br>Sustainability<br>• Manage power and energy supply, ensure KPIs of Power consumption, water consumption, oil/gas consumption meeting targets and continuous improvement.<br>People management<br>• Responsible for new employee’s training and optimizing department’s training system.<br>• Effectively management of behaviour disciplines for the department.<br>• Through people management to build a high productivity and fast leaning team, maintain the morale of whole team.<br>EHS &WWTP<br>• Ensure that the effluent treatment plant is always operating normally.<br>• Manage all EHS activities and be sure all are complying.<br>KPI<br>• All KPIs of engineering department should meet the target, such as machine downtime, RO recycling rate, ESG etc</p>